MTC Wax Cell
Project Name: | Wax Cell Fit Out |
Location: | Coventry |
Client: | Manufacturing Technology Centre (MTC) |
Net Value: | £380,000.00 |
MTC provides hi-tech, high security “cell” facilities for a number of clients within their overall industrial buildings. This project involved providing a clean room and workshop facilities for a confidential client within their existing building. This includes the construction of the actual secure “cell” together with a high-end fit out including resilient services.
Tandem managed the procurement of the design team, the design process, contractor procurement and construction of this fit out.
Project Challenge |
Our Response |
This was a high security facility for a confidential client and so communications with the client to ensure requirements and aspirations were delivered was a challenge. |
We set up a managed process of information sharing, via our client to theirs to ensure the brief was properly captured, interpreted and delivered. |
Service resilience requirements exceeded those available for the base-build |
We worked with the client Estates team and the MEP designers to ensure the requirements could be delivered to meet the users’ requirements. |